Skip to content
Tellency

ERP evaluation · Adelaide

CRM and ERP for Adelaide: connect the sale to the work.

Evaluate Tellency using a complete transaction and an exception your team needs to control. The scenario below connects operating records, responsibilities, and finance so you can compare the demonstrated configuration, integrations, and implementation scope.

By the Tellency team · Updated

BOM changes and production-quality review

Choose a product whose component list changes while a work order remains open. Bring the original and revised requirements, units, quantities, costing inputs, inspection expectation, and the financial result needed at completion.

Ask materials, production, quality, and finance to identify the current instruction, the approval owner, and the source records that support the next action. Use an exception so the demonstration covers correction as well as a successful completion.

Introduce rework or scrap and review the quantities and financial treatment. Confirm any special measurement, traceability, machinery, capacity-planning, or reporting requirement separately. A BOM estimate and quality outcome do not establish every costing or compliance need.

Review the BOM revision and estimate

Tellency implements BOM revisions, approval, activation, multi-level component explosion, and cost estimation from recorded component quantities and unit costs, including configured manufacturing overhead. Demonstrate the required product, revision, component list, and estimate with the people responsible for materials and costing.

Unit conversion is between units of the same type. Confirm product-specific consumption, waste, substitutions, option selection, labour treatment, and quote-time costing separately. A component estimate is not evidence that every actual-job-cost or margin report meets the requirement.

Follow the work order and a quality decision

Tellency implements work-order release, start, hold, resume, and completion. Quality inspections support passed, failed, rework, and scrap outcomes. Follow your sample order and inspect the records and resulting financial transaction with the operator, quality role, and accountant.

Demonstrate change control, partial quantities, unfinished work, and the required correction path. Automatic MRP calculations, finite-capacity scheduling, nesting or cut-list optimization, specialist traceability, and industry certification must be assessed separately rather than inferred from a production screen.

Agree local outputs, migration, and the operating model

Use the Australia country guide and official ATO resources with your adviser to define the required GST/BAS outputs, Single Touch Payroll, payroll documents, superannuation-related connections, and reporting. Demonstrate each supported output and service responsibility; this guide does not assert ATO certification or statutory submission support.

Prepare source records, users, locations, item units, open balances, reports, and integrations. Agree mappings, reconciliations, role-based training, cutover authority, recovery arrangements, and support. Tellency platform pricing starts at $79 USD per user per month; implementation, deployment, integrations, support, and AI usage are confirmed by proposal. Around eight weeks is a typical planning reference; the schedule depends on scope, data readiness, and acceptance. Managed cloud and self-hosted options are available.

Demonstrate the handoff after a sales opportunity is won

For an Adelaide CRM evaluation, start with an enquiry that needs follow-up, qualification and a quotation. Show the owner and opportunity stage, then ask the delivery or warehouse team to identify what it needs from the same customer commitment.

A service business can continue with project tasks, milestones and time entries. A product business can continue with purchasing, receipts and stock transfers. Demonstrate the required handoff and reporting, including any configuration or integration, before agreeing the scope.

Questions before implementation

Can we compare Tellency with NetSuite using this scenario?

Yes. Tellency competes as a connected ERP and CRM platform. Give each team the same transactions, expected results, roles, controls, reports, integrations, deployment, and migration requirements, then compare the evidence and complete commercial proposal.

Does this guide establish every specialist or statutory capability?

No. It identifies implemented workflows and the requirements to validate. Confirm specialist functions, local outputs, service responsibilities, and acceptance criteria in writing for your proposed configuration.

Evaluate Tellency against your own workflows.

Bring your current systems, user count, and operating requirements. We’ll discuss the fit, migration scope, deployment, and total cost.

Book a personalised demo